This past Saturday, I had my next Eagle Project Work Day. We were able to put in a water bar and replace one as well. it was a lot of work, but is was fun and we got a lot done.
![]() |
| Nick digging the trench for the log. |
![]() |
| My dad cut down a tree for the log water bar. |
![]() |
| We had to cut off the branches and take off the bark. That is what Ben and I are doing here. |
![]() |
| If you do it right, you can get the bark off in one chunk. |
![]() |
| The log in the trench. |
![]() |
| Packing the log with dirt. |
![]() |
| The compleated water bar! From left to right: Mr. B, Tyler, Nick, Ben, Me, David and Ryan. My dad was taking the picture. |
![]() |
| The water bar from the side! |







